To have gas connected after the completion of repairs, residents are obliged to allow company employees into each dwelling - this is a requirement of the Rules for the Technical Operation of Gas Supply Systems. In each apartment, before resuming supply, an external inspection and control air pressure test are carried out.
The Dnipro branch of "Gazmerezhi" will plan to restrict gas distribution in Dnipro and Dnipro district throughout August 2026. The works are related to the technical maintenance of the gas distribution system. The company reported this.
Disconnection schedule: August 3-7
August 3: Krushelnytska Lane, 6 (entrance 4)
August 4: Troitska St., 40; Krushelnytska Lane, 6 (entrance 5)
August 5: Shyroka St. (bldgs. 90, 92, 94, 96, 98, 100, 127, 129, 131, 133, 135, 137, 139); Krushelnytska Lane, 6 (entrance 6)
August 6: Pishchana St. (bldgs. 1, 3-6); Archeologichna St. (bldgs. 1/3, 2, 4, 5, 5/1, 11, 13, 15, 17); Staroihrenska St. (bldgs. 102, 102/1, 106, 108, 122, 124, 142, 144, 146, 148b); Krushelnytska Lane, 6 (entrance 7); Topolya-2 residential area (bldg. 26)
August 7: Chechelivska St., 51; Dmytro Yavornytsky St., 36; Krushelnytska Lane, 6 (entrance 8)
Disconnection schedule: August 10-27
August 10: Krushelnytska Lane, 6 (entrance 9)
August 12: Shtormova St. (bldgs. 87, 89, 91, 95, 96, 103, 105, 107, 109)
August 17: Pasteur St., 10, 12
August 27: Havanska St., 11, 17
The repair is financed from the gas distribution tariff. "Gazmerezhi" reminds: services must be paid by the 20th of each month.